
Component Sourcing with ShinePCB
We source components for your BOM through authorized distributor channels, or from customer-designated sources on request. Availability questions are raised before quotation and substitutions are only used with your approval.
- BOM completeness and part numbers
- Availability and alternatives
- Customer-designated sources
- Consigned part split
Capability and certificates
| Positioning | BOM Procurement | |
|---|---|---|
| Standard / prototype | Advanced / mass production | |
| Component Sourcing | Supported | Supported |
Related certificates
Current certificates cover PCB manufacturing only; they do not apply to this service.
Certificate detailsSource: ShinePCB capability workbook, navigation overview. Values are confirmed against your files and the assigned facility during engineering review; certificates are available on request.
Component sourcing and BOM control
| Item | Standard process | Advanced / non-standard |
|---|---|---|
| Component sourcing | Authorized distributors | Customer-designated sources |
| Component types | Resistors, capacitors, inductors, ICs | FPGA, ASIC, RF devices |
| Package support | 0201, QFP, SOP, SOIC | 01005, CSP, BGA, LGA |
| Obsolete components | Active production parts | EOL / hard-to-find components |
| Alternative components | Customer approved | Cross-reference and replacement analysis |
| BOM verification | Quantity check, MPN check | Full DFM and DFA review |
| Component traceability | Batch tracking | Full lot-level traceability |
| Moisture-sensitive devices | MSL 1–3 | MSL 4–6 with dry cabinet control |
| Counterfeit prevention | Visual verification | X-ray inspection, decapsulation, third-party authentication |
Source: ShinePCB BOM capability (process_csv/bom.csv). Substitutions are used only with customer approval.
Typical applications
Prototype and production PCBA
Box build projects
Repeat orders
What to send
Files for an assembly review
- BOM with manufacturer part numbers
- Placement (centroid) file
- Assembly drawing and polarity notes
- Gerber data including paste layers
- Test or programming instructions, if any
Start a project
Share the details you have. Engineering reviews your requirements and raises questions before quotation.
Component Sourcing FAQs
Do you use substitutes?
Only with your approval.
Can I specify the supplier?
Customer-designated sources are available on request.



